Cost Center Accounting | Master Data | In the activity type master data, pre-distribution of fixed costs is not supported for sender cost centers. |
| | |
| Activity Price Calculation | In the planning versions, tab of price calculation, the actual method should be set as Periodic price . |
| | |
| Splitting Structure | In the assignments of the splitting structure configuration, multiple splitting assignments are not supported. | In the Selection for assignment , Group is not supported. | In the splitting rules, only splitting methods 12, 21, 22, 23, 24, and 25 are supported. The Weighting indicator is not supported. | In the selection for splitting rules configuration, version 0 is supported. |
|
| | |
Plan-to-Produce | Master Data | Origin Group of the Delivered material must not be changed | Multiple operation sequences and parallel sequence are not supported. | Operation split for scheduling is not supported. |
|
| | |
Period End Close | Variance Calculation | Target cost versions other than 0 not supported | The explanation function provides less detailed information than before. No explanation is provided for scrap calculation | "Write Line Items" should be selected in the Variance Key definition | Minor differences are not supported. | Primary price variances are not supported. | Variance categories can be posted to different GL Accounts | New T Codes, same as Classic Ones, with a suffix 'H' (i.e. KKS1H) | Performance improvement of the Variance calculation program using the power of HANA | The Close schedules must be updated to include the new programs |
|
| | |
| WIP Calculation | New T. Code KKAOH has been introduced for calculation of WIP Using KKAOH, WIP can only be calculated on production orders, not on product cost collectors or process orders | New WIP report helps to see the details of the WIP GL Account broken down into Primary and Secondary costs of Production orders | Performance improvement of the WIP calculation program using the power of HANA | The Close schedules must be updated to include the new programs | WIP calculation in only one version (Legal Valuation) is supported |
|
| | |
| Assessments & Settlements | To take full advantage of the SAP HANA architecture, assessment cycles and settlement rules to ensure they are working with account- based profitability analysis |
| | |
| Overhead Calculation | The standard dependencies (D000 – D080) are supported. The customer-defined dependencies are not supported | A quantity-based overhead rate should not be referenced by another quantity-based overhead rate. | Object currency conversion is not supported for quantity-based overhead rates. In such cases, the object currency must be the same as the controlling area currency. | Users need to configure the amount using the controlling area currency in the Costing Sheet. | Order and Business Process are not supported as the object to be credited. | From/To origin are not supported. All units of measure of the cost elements defined in the Base must be compatible. |
|
| | |
Order-to-Cash | COGS Postings | COGS can be split between multiple GL accounts to mirror the Cost Components |
| | |
| Credit Management | FI-AR-CR (Credit Management) will be sunset in next release. FSCM-Credit Management must be used |
| | |
Asset Accounting | Technical | Classical AA no longer available. This applies across the system. New AA must be used | Enterprise Extension EA-FIN is MUST. Using New GL is MUST | Leading Valuation can take place in any dep. Area. No longer necessary to use Area 01 for this | SAP EHP7 with business function FIN_AA_PARALLEL requires us to use Ledger Approach only. SFIN Supports both ledger and accounts approach | ALE transfer is not available in New AA | The batch input method for transactions based on AB01 is not available. New BAPIs must be used. Any existing interfaces may have to be reworked | New T Codes, same as Classic Ones, with a suffix 'L'. Old T Codes no longer available. Auto direct to New T Code if one uses the older one |
|
| | |
| Postings | Leading and Parallel Dep. Area can now post in real time. | - Hence, Concept of Delta Dep. Area is Obsolete | Asset postings (i.e. separate documents) can be made separately to each Dep. Area / Accounting principle, using AB01L | - The restriction of transaction types to depreciation areas no longer applies | - User Exit APCF_DIFFERENT_AMOUNTS_GET no longer supported | Simplified management of goods that are to be capitalized in accordance with one set of accounting principles, but are to be posted to expense in accordance with a different set | The integrated posting of investment support on assets using FI transactions is not supported. Tcode ABIFL must be used | Documents before changeover from Classical to New AA cant be reversed. An Inverse posting must be made | Work lists made in AA before the changeover may not work. Hence, all pending tasks with the WL must be processed before the migration or New WL must be created after the Migration | For all asset postings, all posting dep. Areas are updated in real time. Hence, ASKBN is now required only for Dep. Areas that manage reserves for Spl. Depreciation only |
|
| | |
Joint Venture Accounting (Oil & Mining) | | Not Compatible with New Asset Accounting |
| | |
Planning | | New Planning Solution brings financial accounting (FI) and management accounting (CO) together. Flexible Top-Down and Bottom-Up planning function made available | The ability to aggregate and disaggregate data quickly makes it possible to perform simulations and forecasting much faster than was previously possible. | User friendly MS Excel front end and Embedded BI cube makes planning easier. Sample BI cubes are integral part of the SAP now | SAP also delivers a program that automatically analyzes existing customer-specific CO-PA dimensions and generates the corresponding BI objects. | As this planning solution is completely new, it has no impact on existing plan data. SAP will not provide migration functionality. |
|
| | |
Project Systems | Master Data | To take best advantage of the SAP HANA selection capabilities, you must create selection variants |
| | |
| Results Analysis | Only the following results analysis methods are supported: | - Revenue-based results analysis (method 01) | - Cost-based results analysis based on the % of completion (method 03) | Customer enhancement and the other 15 methods are not supported. | Expert Mode is partially supported. | Only RA in Legal Valuation is supported | Planned Results Analysis is not supported. |
|
| | |
Data Archiving | | Data Archiving made redundant, Already Archived documents can still be accessed Data Aging introduced |
| | |
Cash and Liquidity Management | | Classic Cash and Liquidity Management solution is obsolete | New Cash Management Solution on HANA provides the following new features | - Bank Account Management | - Cash Position and Short-Term Cash Forecast | - Embedded Liquidity Planning | - Cash flow and liquidity forecast calculation powered by SAP HANA | - New user experiences with the Net Weaver Business Client (NWBC) |
|
| | |
Year End Close | Balance C/f | The program for carrying forward balances now enables you to initialize data carried forward previously when you want to repeat a balance carryforward |
| | |
Reporting | Income statement by market segments | Reporting uses a logical document that links the financial accounting (FI) line item, the CO line item, and the CO-PA dimensions (where available) to provide an income statement broken down by market segments. |
| | |
| Summarization Hierarchies in CO | Data Collection before hand has been made redundant | On-the-Fly Summarization report has been introduced | Dynamic Summarization, rather than Pre-defined Summarization |
|
| | |
Tables | Summary Tables removed | GLT0, FAGLFLEXT, COSS, COSP, KNC1/3, LFC1/3. (replaced by CDS Views) |
| | |
| Index Tables removed | BSIS, BSAS, BSID, BSAD, BSIK, BSAK, FAGLBSIS, FAGLBSAS (replaced by CDS views) |
| | |
| Impact on custom reports | Custom reports based on above tables will continue to work |
| | |
Logical document | | FI / CO document are now linked at Line Item level This facilitates a logical view of the FI/CO document (Using HANA Live) via program FCO_LOGICAL_DOCUMENT |